Network Modernization Initiative

Technology use on campus has evolved significantly over recent years — most students now bring laptops and tablets to class, and faculty increasingly rely on connected devices for instruction. This summer, Pitt Digital is upgrading PittNet, the University’s Wi-Fi and wired network, to ensure it can support how people teach, learn, and work today.

The upgrade includes:

  • Surveying each building, floor by floor, to measure coverage, identify dead zones, and locate sources of interference
  • Installing nearly 4,000 new Wi-Fi access points and upgrading wired infrastructure across offices, classrooms, and other non-residential areas
  • Upgrading the behind-the-scenes equipment that connects everything together
  • Fine-tuning coverage based on real-world testing

Modernizing a network across dozens of buildings — many constructed as far back as the 1920s, with thick concrete walls that Wi-Fi signals struggle to penetrate — requires careful planning, specialized expertise, and ongoing adjustment once spaces are in active use.

Simplified Network Names

As part of this project, we’re simplifying network names to remove technical jargon and align with how people naturally refer to these services. Both new and legacy names will continue to work. Legacy names will be retired at a future date with significant advance notice. Eduroam is not affected by this change.

Preferred nameAlso know as
PittNetWIRELESS-PITTNET
Pitt GuestPITT GUEST WI-FI

Building Progress

This project covers non-residential areas of campus. MyResNet Wi-Fi in residence halls already features upgraded infrastructure.

Each building moves through site survey, design, installation, and testing before being marked complete.

Stages: Planned  🔵 Up Next  🟡 In Progress  🟢 Complete

Watch status.pitt.edu for scheduled service interruptions in your area.

Building NameGroupStage
Allegheny ObservatoryCPlanned
Allen HallA🟢 Complete
Alumni HallA🟡 In Progress
AtwoodCPlanned
Bakery SquareBPlanned
Barco Law BuildingA🟢 Complete
Baum BlvdBPlanned
Bellefield HallA🟢 Complete
Bellefield Professional BuildingB🟢 Complete
Benedum HallA🔵 Up Next
BioForge Cell & Gene Therapy FacilityCPlanned
Biomedical Science Tower 1 & 2A🔵 Up Next
Biomedical Science Tower 3A🔵 Up Next
Biomedical Science Tower East & WestA🔵 Up Next
Biomedical Science Tower SouthA🔵 Up Next
Bridgeside Point Building 1BPlanned
Bridgeside Point Building 2BPlanned
Carillo Steam PlantCPlanned
Cathedral of LearningA🔵 Up Next
Center for Biotechnology and BioengineeringBPlanned
Chancellor's ResidenceBPlanned
Charles L. Cost Sports CenterBPlanned
Chevron Science CenterA🔵 Up Next
Clapp Hall A🟢 Complete
Clinical & Translation Science InstituteCPlanned
CMU Bldg.4th FloorCPlanned
Community Engagement Center (CEC) - Homewood BPlanned
Crabtree HallA🟡 In Progress
Craig HallBPlanned
Crawford HallC🔵 Up Next
David Lawrence HallA🟢 Complete
Eberly HallA🟡 In Progress
Energy Innovation CenterCPlanned
Eureka BuildingBPlanned
Falk SchoolCPlanned
Fifth & Halket BuildingCPlanned
Fitzgerald Field HouseBPlanned
Forbes Oakland BuildingBPlanned
Forbes TowersA🔵 Up Next
Frick Fine Arts BuildingBPlanned
Gardner Steel Conference CenterA🟢 Complete
Gold Building (3343 Forbes Avenue)BPlanned
Graduate School of Public HealthA🔵 Up Next
Heinz ChapelBPlanned
Hieber BuildingBPlanned
Hillman LibraryA🔵 Up Next
Keystone BuildingBPlanned
Langley HallA🟢 Complete
Lexington Tech Park - Building #1CPlanned
Library and Information ScienceA🟡 In Progress
Life Sciences AnnexA🟢 Complete
Loeffler BuildingBPlanned
McGowan Institute for Regenerative MedicineBPlanned
Melwood - Fleet Services (530)CPlanned
Melwood - Maintenance Building (480)CPlanned
Mervis HallBPlanned
Murdoch BuildingBPlanned
Music BuildingCPlanned
North BellefieldA🟢 Complete
O'Hara Student CenterA🟢 Complete
Oak Hill CommonsCPlanned
Old Engineering Hall A🟢 Complete
Park Plaza BuildingBPlanned
Parkvale BuildingBPlanned
Petersen Events CenterCPlanned
Petersen Sports ComplexBPlanned
Pitt Digital Technology Building CPlanned
Plum Boro Primate Research CenterBPlanned
Property Management BuildingCPlanned
Public Safety BuildingA🔵 Up Next
Pymatuning Research LaboratoryCPlanned
Recreation & Wellness Center CPlanned
RIDC PPG BuildingCPlanned
Riviera Building CPlanned
Salk HallA🟢 Complete
Salk Hall - AnnexA🟢 Complete
Salk Hall - PavillionA🟢 Complete
Scaife HallBPlanned
Schenley PlaceBPlanned
Sennott SquareBPlanned
Soldiers & Sailors Memorial HallCPlanned
South Side Works CPlanned
Space Research Coordination Center (SRCC)A🟢 Complete
Stephen Foster MemorialCPlanned
Sterling BuildingCPlanned
Strand Building CPlanned
Thackeray HallA🟢 Complete
Thaw HallA🟢 Complete
The AssemblyCPlanned
Thomas BoulevardBPlanned
Towerview GarageCPlanned
Trees Field (Dome)CPlanned
Trees HallBPlanned
University Child Development Center (UCDC)BPlanned
University ClubBPlanned
UOP Chiller Plant CPlanned
UPMC Sports Performance ComplexCPlanned
VA Pittsburgh Healthcare System (VAPHS)CPlanned
Van De Graaff Building (Nuclear Physics)A🟢 Complete
Victoria BuildingBPlanned
Wesley W. Posvar HallA🔵 Up Next
William Pitt UnionA🔵 Up Next