412-624-HELP

Network Modernization Initiative

Technology use on campus has evolved significantly over recent years — most students now bring laptops and tablets to class, and faculty increasingly rely on connected devices for instruction. This summer, Pitt Digital is upgrading PittNet, the University’s Wi-Fi and wired network, to ensure it can support how people teach, learn, and work today.

The upgrade includes:

  • Surveying each building, floor by floor, to measure coverage, identify dead zones, and locate sources of interference
  • Installing nearly 4,000 new Wi-Fi access points and upgrading wired infrastructure across offices, classrooms, and other non-residential areas
  • Upgrading the behind-the-scenes equipment that connects everything together
  • Fine-tuning coverage based on real-world testing

Modernizing a network across dozens of buildings — many constructed as far back as the 1920s, with thick concrete walls that Wi-Fi signals struggle to penetrate — requires careful planning, specialized expertise, and ongoing adjustment once spaces are in active use.

Simplified Network Names

As part of this project, we’re simplifying network names to remove technical jargon and align with how people naturally refer to these services. Legacy names will continue to work until they are retired on Aug. 12, 2026. Eduroam is not affected by this change.

Preferred nameAlso know as
PittNetWIRELESS-PITTNET
Pitt GuestPITT GUEST WI-FI

Building Progress

This project covers non-residential areas of campus. MyResNet Wi-Fi in residence halls already features upgraded infrastructure.

Each building moves through site survey, design, installation, and testing before being marked complete.

Stages: Planned  🔵 Up Next  🟡 In Progress  🟢 Complete

Watch status.pitt.edu for scheduled service interruptions in your area.

Building NameGroupStage
Allegheny ObservatoryCPlanned
Allen HallA🟢 Complete
Alumni HallA🟢 Complete
AtwoodC🔵 Up Next
Bakery SquareB🔵 Up Next
Barco Law BuildingA🟢 Complete
Baum BlvdBPlanned
Bellefield HallA🟢 Complete
Bellefield Professional BuildingB🟢 Complete
Benedum HallA🟢 Complete
BioForge Cell & Gene Therapy FacilityCPlanned
Biomedical Science Tower 1 & 2A🟡 In Progress
Biomedical Science Tower 3A🟢 Complete
Biomedical Science Tower East & WestA🟡 In Progress
Biomedical Science Tower SouthA🟢 Complete
Bridgeside Point Building 1B🟡 In Progress
Bridgeside Point Building 2B🟡 In Progress
Carillo Steam PlantCPlanned
Cathedral of LearningA🟡 In Progress
Center for Biotechnology and BioengineeringB🔵 Up Next
Chancellor's ResidenceB🟢 Complete
Charles L. Cost Sports CenterBPlanned
Chevron Science CenterA🟡 In Progress
Clapp Hall A🟢 Complete
Clinical & Translation Science InstituteCPlanned
CMU Bldg.4th FloorCPlanned
Community Engagement Center (CEC) - Homewood BPlanned
Crabtree HallA🟢 Complete
Craig HallB🔵 Up Next
Crawford HallC🔵 Up Next
David Lawrence HallA🟢 Complete
Eberly HallA🟢 Complete
Energy Innovation CenterCPlanned
Eureka BuildingBPlanned
Falk SchoolC🟢 Complete
Fifth & Halket BuildingCPlanned
Fitzgerald Field HouseBPlanned
Forbes Oakland BuildingBPlanned
Forbes TowerA🟡 In Progress
Frick Fine Arts BuildingBPlanned
Gardner Steel Conference CenterA🟢 Complete
Gold Building (3343 Forbes Avenue)B🔵 Up Next
Graduate School of Public HealthA🟡 In Progress
Heinz ChapelBPlanned
Hieber BuildingBPlanned
Hillman LibraryA🟡 In Progress
Keystone BuildingBPlanned
Langley HallA🟢 Complete
Lexington Tech Park - Building #1CPlanned
Library and Information ScienceA🟢 Complete
Life Sciences AnnexA🟢 Complete
Loeffler BuildingBPlanned
McGowan Institute for Regenerative MedicineB🔵 Up Next
Melwood - Fleet Services (530)CPlanned
Melwood - Maintenance Building (480)CPlanned
Mervis HallB🔵 Up Next
Murdoch BuildingB🟢 Complete
Music BuildingCPlanned
North BellefieldA🟢 Complete
O'Hara Student CenterA🟢 Complete
Oak Hill CommonsCPlanned
Old Engineering Hall A🟢 Complete
Park Plaza BuildingB🔵 Up Next
Parkvale BuildingBPlanned
Petersen Events CenterCPlanned
Petersen Sports ComplexBPlanned
Pitt Digital Technology Building CPlanned
Plum Boro Primate Research CenterBPlanned
Property Management BuildingCPlanned
Public Safety BuildingA🟢 Complete
Pymatuning Research LaboratoryCPlanned
Recreation & Wellness Center C🔵 Up Next
RIDC PPG BuildingCPlanned
Riviera Building CPlanned
Salk HallA🟢 Complete
Salk Hall - AnnexA🟢 Complete
Salk Hall - PavillionA🟢 Complete
Scaife HallB🟢 Complete
Schenley PlaceBPlanned
Sennott SquareB🔵 Up Next
Soldiers & Sailors Memorial HallCPlanned
South Side Works CPlanned
Space Research Coordination Center (SRCC)A🟢 Complete
Stephen Foster MemorialCPlanned
Sterling BuildingCPlanned
Strand Building CPlanned
Thackeray HallA🟢 Complete
Thaw HallA🟢 Complete
The AssemblyCPlanned
Thomas BoulevardB🔵 Up Next
Towerview GarageCPlanned
Trees Field (Dome)CPlanned
Trees HallBPlanned
University Child Development Center (UCDC)B🔵 Up Next
University ClubB🔵 Up Next
UOP Chiller Plant CPlanned
UPMC Sports Performance ComplexCPlanned
VA Pittsburgh Healthcare System (VAPHS)CPlanned
Van De Graaff Building (Nuclear Physics)A🟢 Complete
Victoria BuildingBPlanned
Wesley W. Posvar HallA🟡 In Progress
William Pitt UnionA🟡 In Progress