Network Modernization Initiative

PittNet Wi-Fi Name Changed at UPMC Locations Sept. 3. Learn more.

Technology use on campus has evolved significantly over recent years — most students now bring laptops and tablets to class, and faculty increasingly rely on connected devices for instruction. This summer, Pitt Digital is upgrading PittNet, the University’s Wi-Fi and wired network, to ensure it can support how people teach, learn, and work today.

The upgrade includes:

  • Surveying each building, floor by floor, to measure coverage, identify dead zones, and locate sources of interference
  • Installing nearly 4,000 new Wi-Fi access points and upgrading wired infrastructure across offices, classrooms, and other non-residential areas
  • Upgrading the behind-the-scenes equipment that connects everything together
  • Fine-tuning coverage based on real-world testing

Modernizing a network across dozens of buildings — many constructed as far back as the 1920s, with thick concrete walls that Wi-Fi signals struggle to penetrate — requires careful planning, specialized expertise, and ongoing adjustment once spaces are in active use.

Simplified Network Names

As part of this project, we’re simplifying network names to remove technical jargon and align with how people naturally refer to these services. Legacy names will continue to work until they are retired on Aug. 12, 2026. Eduroam is not affected by this change.

Preferred nameAlso know as
PittNetWIRELESS-PITTNET
Pitt GuestPITT GUEST WI-FI

Building Progress

This project covers non-residential areas of campus. MyResNet Wi-Fi in residence halls already features upgraded infrastructure.

Each building moves through site survey, design, installation, and testing before being marked complete.

Stages: ⚪ Planned  🔵 Up Next  🟡 In Progress  🟢 Complete

Watch status.pitt.edu for scheduled service interruptions in your area.

Building NameGroupStage
Allegheny ObservatoryC🟢 Complete
Allen HallA🟢 Complete
Alumni HallA🟢 Complete
AtwoodC🟢 Complete
Bakery SquareB🟢 Complete
Barco Law BuildingA🟢 Complete
Bellefield HallA🟢 Complete
Bellefield Professional BuildingB🟢 Complete
Benedum HallA🟢 Complete
BioForge Cell & Gene Therapy FacilityC🟢 Complete
Biomedical Science Tower 1 & 2A🟢 Complete
Biomedical Science Tower 3A🟢 Complete
Biomedical Science Tower East & WestA🟢 Complete
Biomedical Science Tower SouthA🟢 Complete
Bridgeside Point Building 1B🟢 Complete
Bridgeside Point Building 2B🟢 Complete
Carillo Steam PlantC🟢 Complete
Cathedral of LearningA🟢 Complete
Center for Biotechnology and BioengineeringB🟢 Complete
Chancellor's ResidenceB🟢 Complete
Charles L. Cost Sports CenterB🟡 In Progress
Chevron Science CenterA🟢 Complete
Clapp Hall A🟢 Complete
Community Engagement Center (CEC) - Homewood B🟢 Complete
Crabtree HallA🟢 Complete
Craig HallB🟢 Complete
David Lawrence HallA🟢 Complete
Eberly HallA🟢 Complete
Energy Innovation CenterC🟢 Complete
Eureka BuildingB🟢 Complete
Falk SchoolC🟢 Complete
Fifth & Halket BuildingC🟢 Complete
Fitzgerald Field HouseB🟢 Complete
Forbes Oakland BuildingB🟢 Complete
Forbes TowerA🟢 Complete
Frick Fine Arts BuildingB🟢 Complete
Gardner Steel Conference CenterA🟢 Complete
Gold Building (3343 Forbes Avenue)B🟢 Complete
Graduate School of Public HealthA🟢 Complete
Heinz ChapelB🟡 In Progress
Hieber BuildingB🟢 Complete
Hillman LibraryA🟢 Complete
Keystone BuildingB🟡 In Progress
Langley HallA🟢 Complete
Library and Information ScienceA🟢 Complete
Life Sciences AnnexA🟢 Complete
Loeffler BuildingB🟢 Complete
McGowan Institute for Regenerative MedicineB🟢 Complete
Melwood - Fleet Services (530)C🟡 In Progress
Melwood - Maintenance Building (480)C🟡 In Progress
Mervis HallB🟢 Complete
Murdoch BuildingB🟢 Complete
Music BuildingC🟢 Complete
North BellefieldA🟢 Complete
O'Hara Student CenterA🟢 Complete
Oak Hill CommonsC🟢 Complete
Old Engineering Hall A🟢 Complete
Park Plaza BuildingB🟢 Complete
Parkvale BuildingB🟢 Complete
Petersen Events CenterC🟡 In Progress
Petersen Sports ComplexB🟢 Complete
Pitt Digital Technology Building C🟢 Complete
Plum Boro Primate Research CenterB🟢 Complete
Property Management BuildingC🟢 Complete
Public Safety BuildingA🟢 Complete
Pymatuning Research LaboratoryC🟡 In Progress
Recreation & Wellness Center C🟢 Complete
RIDC PPG BuildingC🟡 In Progress
Riviera Building C🟢 Complete
Salk HallA🟢 Complete
Salk Hall - AnnexA🟢 Complete
Salk Hall - PavillionA🟢 Complete
Scaife HallB🟢 Complete
Schenley PlaceB🟢 Complete
Sennott SquareB🟢 Complete
Soldiers & Sailors Memorial HallC🟢 Complete
South Side Works C🟢 Complete
Space Research Coordination Center (SRCC)A🟢 Complete
Stephen Foster MemorialC🟢 Complete
Sterling BuildingC🟡 In Progress
Strand Building C🟢 Complete
Thackeray HallA🟢 Complete
Thaw HallA🟢 Complete
The AssemblyC🟢 Complete
Thomas BoulevardB🟢 Complete
Towerview GarageC🟢 Complete
Trees Field (Dome)C🟢 Complete
Trees HallB🟢 Complete
University Child Development Center (UCDC)B🟢 Complete
University ClubB🟢 Complete
UOP Chiller Plant C🟡 In Progress
UPMC Sports Performance ComplexC🟡 In Progress
VA Pittsburgh Healthcare System (VAPHS)C🟡 In Progress
Van De Graaff Building (Nuclear Physics)A🟢 Complete
Victoria BuildingB🟢 Complete
Wesley W. Posvar HallA🟢 Complete
William Pitt UnionA🟢 Complete